International projects on financial and technical assistance

 

 

 

2025 – 2030 – EUR 47.2 thousand

RISE-UP – Resilient Investments for Sustainable Environment

Development and Implementation of Climate-Resilient Solutions

 

 

2025 – 2028 – EUR 72.8 thousand

International Urbact Transfer Networks “Entrepreneurship+ Academy”

Developmant of entrepreneurial education among youth throuhg the transfer of good practies from Albergaria-a-Velha (Portugal). The program teaches students to think creatively, generate business ideas and projects based on the “learning by doing” principle, engaging entrepreneurs and the community to foster local economic growth

 

 

2024 – 2028 – EUR 143.1 thousand

Ukraine on the Path to Carbon Neutrality (U_CAN)

Development and implementation of measures for climate change mitigation and adaptation.

 

 

 

2024 – 2027 – EUR 55.9 thousand

Meeting the Needs for Transition to Clean Energy

Development of innovative financing instruments for energy efficiency projects.

 

 

 

 

2012 – 2027 – EUR 17.0 million

District Heating in Zhytomyr City

Reduction of energy losses, gas and electricity consumption, and improvement of heating service quality in the city

 

 

 

2025 – 2026 – EUR 17.0 million

Modernization of District Heating System in Zhytomyr

Reconstruction of part of the premises of KP “Hospital No. 1” Zhytomyr City Council for the establishment of a Rehabilitation Department

 

 

2024-2026 – EUR 2.0 million

Design and Construction of 3 Family-Type Homes in the Zhytomyr Urban Territorial Community

Construction of three family-type homes within the community, each designed to accommodate parents and up to 8 children

 

 

2025 – EUR 699.7 thousand

Design and Construction of a Family-Type Home in the Zhytomyr Urban Territorial Community

Construction of one family-type home within the community, designed to accommodate parents and up to 8 children

 

 

 

2025 – EUR 561.4 thousand

Enhancing Urban Resilience in the Sphere of Critical Infrastructure for Ukrainian Communities

Implementation of measures aimed at strengthening the community’s life-support systems, ensuring sustainable operation of critical infrastructure facilities related to heat supply, electricity supply, and distribution

 

 

2025 – UAH 1.8 million

Receipt of International Assistance from International Donors

Supply of equipment for the reconstruction of pumping stations (sewage pumping stations – SPS/KNS)

 

 

 

2024 – 2025 – EUR 1.3 million

Construction of a Multi-Profile Hospital in Zhytomyr City

Development of the Feasibility Study (FS/TEO) for a multi-profile hospital in Zhytomyr

 

 

2024 – 2025 – EUR 23.4 million (EIB funds) + UAH 4.8 million (local budget)

Reconstruction of the Operating Block in the Surgical Building of KP “Hospital No. 2 named after V.P. Pavlusenko”

Reconstruction of the surgical building block at the Communal Enterprise “Hospital No. 2 named after V.P. Pavlusenko” has been carried out

 

 

2024 – 2025 – EUR 99.8 thousand (GIZ funds) + UAH 6.6 million (local budget)

Implementation of the Project “Promoting Energy Efficiency and Implementation of the EU Energy Efficiency Directive in Ukraine”

Energy efficiency in educational institutions. Reconstruction of engineering networks at Zhytomyr Preschool Educational Institution No. 15 (ZhDNZ No. 15)

 

 

 

2023 – 2025 – EUR 8.0 million

EU Support for Providing Housing to Internally Displaced Persons in Zhytomyr

Construction of housing for IDPs

 

2023 – 2025 – EUR 180.8 million

Reconstruction of Housing for IDPs

Reconstruction of non-residential premises into a social shelter (dormitory) for internally displaced persons and other vulnerable groups

 

 

 

2023 – 2025 – UAH 20.2 million

Support for Rapid Economic Recovery of Ukrainian Municipalities (SRER)

Creation of an Entrepreneurship Laboratory

 

 

 

2023 – 2025 – UAH 12.6 million

Construction of a Water Supply Network from Myru Avenue to Lisove Settlement

Ensuring proper access to safe drinking water and improving sanitary conditions for the children of the community

 

 

 

2014 – 2025 – USD 2.1 million

Urban Infrastructure Development II

Rehabilitation of critical infrastructure facilities (water supply and wastewater systems under CERC)

 

 

 

2024 – EUR 23.1 thousand (equipment from SOLSOL s.r.o., Czech Republic) + UAH 311.7 thousand (local budget)

Development of Renewable Energy Sources in Healthcare Facilities

Installation works for solar panels to generate electricity for the Communal Enterprise “Hospital No. 1” of Zhytomyr City Council

 

 

 

2024 – PLN 42.4 thousand

Rebuilding Hope: Psychological Assistance and Support for People Affected by the War in Ukraine

Training of 28 specialists providing social services to individuals who have experienced war-related traumatic events

 

 

2021 – 2024 – Technical Assistance

Development of Processing Industry and Logistics within the EU4Business Programme: Competitiveness and Internationalisation of SMEs

Development of small and medium-sized enterprises, including the creation of the local producers’ brand “DoBre”, organization of the “Made in Zhytomyr” event, and a study visit to Portugal for experience exchange with local entrepreneurs

 

 

2023 – UAH 1.1 million

Implementation of the “Export School” Project

Delivery of a training program for small and medium-sized enterprises (SMEs) aimed at strengthening the market positions of local producers on the international arena

 

 

 

2022  – EUR 120.7 thousand

Reconstruction of Housing for IDPs

Reconstruction of non-residential premises into a social shelter for internally displaced persons and other socially vulnerable groups of the population

 

 

2021 – 2029 – EUR 17.7 million

Improvement of Energy Efficiency in Municipal Infrastructure

Comprehensive thermal renovation of 40 educational institution buildings in the Zhytomyr Urban Territorial Community (UTC)

 

 

2015 – 2021 – CHF 18.6 million

Ensuring Energy Efficiency and Rational Use of Energy Resources

Installed 53 units (out of 119 planned) of individual heat substations (IHS); replaced 4.3 km (out of 6.8 km planned) of heat networks; construction and installation works carried out for the installation of a thermodynamic plant based on the Organic Rankine Cycle (ORC)

 

 

 

2014 – 2022 – USD 39.9 million

Ensuring the Provision of High-Quality Water Supply to Consumers, Proper Wastewater Treatment and Disposal, and Reduction in Electricity Consumption

Automation and Optimization of Production Processes

 

2019 – 2026 – EUR 9.8  million

Improvement of Energy Efficiency in Electric Transport Infrastructure

Capital repair of 4 traction substations and the trolleybus depot in Zhytomyr city

 

 

2015 – 2021 – USD 17.0 million

Ensuring energy efficiency and reducing energy consumption in heat supply, decrease in СО2, SО2, NOх emissions

80 % of works performed – 60 (76) individual heating units have been installed; 4.3 km (7.9 km)

 

 

 

2019 – 2021 – EUR 177.7 thousand

TUMI: Get to School Sustainably. Increasing the safety of pedestrians and stimulation sustainable mobility

Covered bicycle parking lots have been installed; a cycling school for children has been held; a capital repair of pedestrian crossings, intersections and pavements at four schools of Zhytomyr city amalgamated community has been carried out

 

 

 

2015 – 2020 – USD 30.0 million

Development of water supply and water disposal systems in Zhytomyr

Replacement of energy-intensive equipment, utility networks; introduction of automated control systems

 

 

 

2018 – 2022 – UAH 16.7 million

Restoration of an architectural monument of local significance Water Tower

Commercialization of the tourist potential of Zhytomyr and Zhytomyr oblast

 

 

 

 

2019 – USD 18.0 thousand

Development of Public Utilities Primary Healthcare Centers as centers of excellence

Providing methodological support to the Public Utility “Primary Healthcare Center” in Zhytomyr

 

 

 

 

2018 – 2019 – EUR 157.4 thousand

Increasing the energy efficiency of public sector facilities

Energy-efficient thermal rehabilitation of the building of the internal medicine department of Public Utility “Likarnia No. 1” in Zhytomyr

 

 

 

2017 – 2019 – Technical Assistance

Project implementation on the basis of the mechanism of public-private partnership (PPP)

Gaining successful experience in Zhytomyr in the implementation of PPP

 

 

2017 – 2019 – EUR 23.3 thousand

Increasing the energy efficiency of public sector facilities

Rehabilitation of the department of infectious disease of Public Utility “Likarnia No. 1”

 

 

2016 – 2018 – EUR 5.0 million

Integrated city development in Ukraine

 

 

2015 – 2018 – CHF 18.6 million

Energy efficiency in Zhytomyr

Rehabilitation of a part of the municipal district heating system and some buildings (nursery schools)

 

 

2016 – 2017 – UAH 400.0 thousand

Increasing the investment attractiveness and competitive ability of the regions in Ukraine

The City Development Agency was created; the Agency also provides support to entrepreneurship

 

 

 

2015 -2017 – EUR 4.75  million

Improvement of energy efficiency in budget sector facilities of Zhytomyr city

Annual heat energy savings: 9.1 GWh; annual CO₂ emissions reduction: 2,111.7 tonnes

 

 

 

2015 -2017 – EUR 15.7 million 

Development of heat supply system у Житомирі

Reduction in gas consumption by 15.0 million Nm³ (annual); reduction in electricity consumption by 12 GWh (annual); reduction in repair and maintenance costs.

 

 

2016 – UAH 9.0 million

Public budget – collective success of citizens and open authorities

Implementation of public social projects in the city